google6bfda06bd20b260a.html

Jesus Does the Heavy Lifting

Jul 27, 2025

The Choluteca Bridge stands as a testament to how things can change. Originally built in 1935 and completely rebuilt in 1996 - the Choluteca Bridge no longer spans the Choluteca River. Why is that? Because in 1998, Hurricane Mitch dumped 75 INCHES of rain - and all that water CHANGED the course of the river. The American church faces a similar situation. All our programming and efforts from the 1950s to the 1990s was designed for a river that has MOVED (and that river is American culture). The good news? Jesus is already at work. In fact, he never stopped working in the lives of Americans to redeem and restore humanity - one human being at a time. Are you ready to join Jesus on his mission?